Power Consumption — Video Tutorial
2025-11-14
Short video guide and the minimal procedure to reproduce the reported power measurements.
Video
Quick checklist
- Confirm power monitor connected to VBAT & GND and calibrated.
- Open serial console and verify firmware.
- Record idle current, then trigger sleep modes and record stable readings.
- Run active tests (iperf 1-minute streams) to capture peaks.
- Export logs and save peak/average values.
Core steps
- Configure power-supply logging (set range & sampling for low-current capture).
- Connect hardware (VBAT, GND; remove jumpers as needed).
- Use serial console to enter sleep modes or start tests.
- Start logging, perform actions, wait for stable readings, then stop and export.
- Compare results with expected values and the comprehensive report.
Tools & expected values
Power monitor (model & sampling per your lab). Suggested sampling: 10 kHz for peak capture.
Serial tool: 115200 baud. Router: HUAWEI AX3 Pro (for DTIM tests). Phone: Honor 70 (AP tests).
Expected: Deep sleep ≈ 16.3 uA; Light sleep ≈ 77.7 uA; DTIM1 light sample ≈ 6.02 mA.
Data source: FGM842D Comprehensive Test Report (Comprehensive-Test-Report).
Note: Measurements may vary between firmware versions — record the module firmware version when taking measurements. The above data were obtained using the AT firmware. For flashing instructions, see AT Firmware Flashing Guide